CP Activity Calendar 2016




Phase
Completion Date
Submission To
1. If Project is based on Survey:
Questionnaire Development and Approval

2. If Project is Industry Study Based:
Contact respective faculty Guide for further process
27-02-2016
Respective Faculty Guide
1. If Project is based on Survey:
Data Collection and Entry in Excel or SPSS for Data Analysis

2. If Project is Industry Study Based:
Collect Secondary data if required or meet respective faculty guide for further process
10-03-2016
Respective Faculty Guide
Data Analysis and Interpretation
28-03-2016

Mock Viva
07-04-2016

Final Report Submission:
Two Copies of Report:
One is Hard Bound(For Institute) Second is Spiral Bound(For Student)
14-04-2016
1. Submit to Respective Faculty Guide and Take Sign of him/her on both the Reports.
2. College Stamp on Institute Certificate on both the Reports.
3. Final Submission:
-Section 1A,1B,1C– Prof. Rajani Shah
-Section D, E, 2A, 2B - Dr. Siddharth Das
Final Viva of GTU
May 2016



Comprehensive Project (CP)  - 2015


 The last date for the First submission of CP including Introduction and Literature Review is 19th Oct, 2015, Monday. 
The submission should be made to respective Faculty Guides in soft copy.

 

GCSR Report Submission - 2015-16
Semester - III

Phase
Completion Date
Submission to
CEC Marks
STEEPELED analysis of selected sector/industry in the country of study
STEEPELED analysis of selected sector/industry in Gujarat
Comparative analysis of STEEPELED in tabular form

10/10/2015
Faculty Guide
15
SWOT Analysis of selected sector/industry in the country of study, in Gujarat and in selected state
21/10/2015
Faculty Guide
15
Mock viva and Report approval
26/10/2015

10



Xcellent Cinema Enabled Learning (XCEL)

Showcasing 

Movie -  "Other People';s Money"

on

 18th of September, 2014

at

 L J Engineering auditorium
 at

 sharp 12.15PM.  



Xcellent Cinema Enabled Learning (XCEL)

Showcasing 

Movie -  " Flight of the Pheonix" 

for semester III students ( First shift only) 

on



9th of October;2014

at

 L J Engineering Auditorium

at

 sharp 12.00 pm 


Xcellent Cinema Enabled Learning (XCEL)

Showcasing 

Movie -  "Tommy Boy"

for semester I students ( First & Second Shift) 

on



10th of October;2014

at

 L J Engineering Auditorium

at

 sharp 1.30 pm  



CP SUBMISSIONS

This is to inform you that the CP Research Proposals have to be submitted by the students on or before November 22, 2014. 

Note: 1.  No. of pages for the report (Sem. III) is approx. 30-40 pages.

2. The formats of CP Report is available at GTU website.


GCSR Activity Calendar 2014 - 15

Phase
Date
Comment
CEC Marks
Mock Viva and Report Approval    
21/11/2014     
Students Presentation  
10
Final Submission of Report
                                                                 24/11/2014











CP REVIEW (For IV Sem. Students)


All students have to meet their respective CP Guides for CP Review during the week February 23 to 28 . The Review entails your CP progress. 

GCSR Activity Calendar 2015 - 16


Mock Viva
28/03/2015
Student Presentation
20 Marks
Final Submission of the Report
02/04/2015
Spiral bound report submission to GCSR coordinator duly signed by faculty guide


CP Activity Calendar 2016




Phase
Completion Date
Submission To
1. If Project is based on Survey:
Questionnaire Development and Approval

2. If Project is Industry Study Based:
Contact respective faculty Guide for further process
27-02-2016
Respective Faculty Guide
1. If Project is based on Survey:
Data Collection and Entry in Excel or SPSS for Data Analysis

2. If Project is Industry Study Based:
Collect Secondary data if required or meet respective faculty guide for further process
10-03-2016
Respective Faculty Guide
Data Analysis and Interpretation
28-03-2016

Mock Viva
07-04-2016

Final Report Submission:
Two Copies of Report:
One is Hard Bound(For Institute) Second is Spiral Bound(For Student)
14-04-2016
1. Submit to Respective Faculty Guide and Take Sign of him/her on both the Reports.
2. College Stamp on Institute Certificate on both the Reports.
3. Final Submission:
-Section 1A,1B,1C– Prof. Rajani Shah
-Section D, E, 2A, 2B - Dr. Siddharth Das
Final Viva of GTU
May 2016